UttaraRakshaMulti-Hazard Intelligence
Dashboard
Analytics
Response
Reports
SDG 6 SDG 11 SDG 13 SDG 15
Uttarakhand · 53,483 km² · 10.1M pop
LIVE ALERTS
⚠ IMD: Heavy rainfall warning Chamoli, Rudraprayag -- 04 Apr 2026 ▲ NDRF: Team deployed to Joshimath sector, subsidence monitoring active ◼ SDRF: Rishikesh gauge crossing warning level (340.2m vs 339.5m danger) ★ Forest Dept: Fire alert Pauri Garhwal -- 3 active spots, ground teams dispatched ◆ NHAI: Char Dham NH-7 blocked at km 142, debris fall, alt route via Tehri ⚠ ISRO/NRSC: InSAR data shows 2.1mm subsidence in Karnaprayag sector (15 days) ⚠ IMD: Heavy rainfall warning Chamoli, Rudraprayag -- 04 Apr 2026 ▲ NDRF: Team deployed to Joshimath sector, subsidence monitoring active ◼ SDRF: Rishikesh gauge crossing warning level (340.2m vs 339.5m danger) ★ Forest Dept: Fire alert Pauri Garhwal -- 3 active spots, ground teams dispatched ◆ NHAI: Char Dham NH-7 blocked at km 142, debris fall, alt route via Tehri ⚠ ISRO/NRSC: InSAR data shows 2.1mm subsidence in Karnaprayag sector (15 days)

Risk Level

Very High (80-100)
High (60-80)
Moderate (40-60)
Low (0-40)

Layers

Landslide
Flood
Wildfire
Drought

Landslides per Year

Flood Events per Monsoon

Fire Hotspots by Month (2024)

Rainfall Anomaly by District (%)

AI Risk Predictions (Next 72 Hours)

▲ Landslide Risk HIGH
Chamoli: 87% probability
Rudraprayag: 72%
Trigger: 120mm rain + saturated soil
Model: LSTM + InSAR + IMD fusion
◼ Flood Forecast WARNING
Monsoon: Above normal
3 districts: Haridwar, Tehri, Rudraprayag
Alaknanda: +1.2m above normal
Model: CWC + ECMWF ensemble
★ Fire Spread ACTIVE
Pauri: NE wind 12 km/h
Spread: 2 km/h
3 settlements within 5km
Model: FWI + MODIS + wind
Containment: 48-72 hrs

Major Disaster Timeline (2013-2026)

June 2013
Kedarnath Flash Flood
5,700+ killed. Cloudburst + GLOF. Mandakini devastated. Rs 12,000 Cr damage.
Oct 2016
Pithoragarh Landslide
12 villages cut off. 56 deaths. Kali valley debris flows.
Aug 2019
Chamoli-Joshimath Floods
200+ km road damaged. Tourism disrupted. Rs 2,800 Cr losses.
Feb 2021
Chamoli Rock-Ice Avalanche
204 killed. Rishi Ganga flood. 2 dams destroyed. 150 km cascade.
Oct 2021
Multi-District Flooding
72 deaths, 1,200 homes destroyed. Heaviest October rain in 60 years.
Jan 2023
Joshimath Subsidence
868 buildings cracked. 4,500 displaced. National crisis declared.
Apr-Jun 2024
Fire Season Crisis
1,500+ fires. 2,800 ha burned. AQI 400+. IAF bambi bucket ops.
2022-2023
Kumaon Drought
400+ villages. 60% springs dried. Rs 800 Cr crop losses.

Team Deployment Status

Shelter Dashboard

Resource Inventory

Inter-Agency Communication Log

District Risk Reports

Seasonal Risk Analysis

FactorMonsoon (Jun-Sep)Winter (Nov-Feb)Fire (Mar-Jun)Post-Monsoon (Oct-Nov)
Primary HazardFlood + LandslideSnow AvalancheForest FireDebris Flow
Risk LevelEXTREMEHIGHHIGHMODERATE
Districts at RiskChamoli, Rudraprayag, Uttarkashi, Tehri, HaridwarUttarkashi, Chamoli, PithoragarhPauri, Nainital, Almora, ChampawatChamoli, Rudraprayag, Bageshwar
Avg Annual Events280+451,500+90
Economic ImpactRs 3,500 CrRs 400 CrRs 600 CrRs 1,200 Cr
Key Data SourceIMD, CWC, NRSCSASE, IMD, BROFSI, MODIS, VIIRSGSI, ISRO, SDMA